Conair Hopper Temperature Controller UGD031 Manual do Utilizador Página 27

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 26
3
Description
Installation l 3-7
Installing the Isolation Valves
NOTE: Isolation valves should be installed when multiple hoppers are connected
to a single dryer or blower.
1 Turn the disconnect dial on the control center door to the Off or “O” posi-
tion. Lock out the main power (see Page 1-5 for complete lock out informa-
tion).
2 Install one isolation valve in the return air line. Secure the hoses on the
valve with hose clamps.
3 Install the other isolation valve in the delivery air line. Secure the hoses on
the valve with hose clamps.
ON
O OFF
Vista de página 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 96 97

Comentários a estes Manuais

Sem comentários