
GSL 9-12-12 IM Page 6
4 INSTALLATION
4.1 GSL
Install flexible hose, secured with hose clamps
at both ends, from feed tube to material inlet
tube of loader. A Proportioning Valve, if
included (see separate instructions) is installed
on the material inlet tube with a compression
style coupling.
(see page 3)
Solenoid Valve to
Compressed Air
(Pilot for Blowback)
Locate HINGE away from
operator for easy cleaning
Control Pendant
(see page 6)
Feed Tube
Inserted into material
Install flexible compressed air line to the
solenoid valve fitting (below lid hinge). Source
should provide clean, dry compressed air supply
80 -100 psi. Use only full-flow quick disconnect
fitting for best blowback performance.
CAUTION: Use a second wrench to hold the
fitting on the GSL securely while tightening the
hose fitting. DO NOT apply direct pressure, or
damage the GSL fitting or an air leak could
result. A compressed air filter (sold separately)
is recommended for protection of pneumatic
Plug power cord into 115 VAC power
source. Note amperage listing on loader
for correct voltage and capacity.
stays in place
Comentários a estes Manuais